Notes on Costs & comparison.
Everything on costs & comparison for machinery builders and technical service operators between 50 and 500 employees – with sourced figures and no price talk.
Calculating vacancy costs: the formula
At a factor of three the vacancy exceeds a full annual salary after 120 days. In service something else is added that appears in no cost centre.
In-house recruiting vs. agency: compared
Four routes to choose from, all with the same design flaw: they start from zero at every vacancy. Where the threshold sits for building your own system.
One company per specialisation and area. Every slot is currently taken.
Put your name down. As soon as a slot opens in your area we will come back to you – with an assessment, not a pitch.
What happens next
- You leave a postcode and a website. That is all we need to place your catchment area.
- We come back as soon as we can – and we decline if your area is taken or the role cannot be filled. Honestly, before you lose time.
- If it fits, we run your area together: how many suitable technicians work within range, and what the build would cost you – including when we advise against it.